Skip to content

Operational Times & Maintenance

Operational Times

TODO

During "Operational Times" installations are called as necessary; outside these times they are treated as disconnected. Schedule operational times using the interactive calendar.

Maintenance

TODO

Create maintenance plans to account for downtime and expenses.

TODO

Add entries with:

  • Name
  • Interval (hours between events)
  • Downtime Length (hours)
  • Parts Cost
  • Labour Cost
  • Deferral Plan: Immediate (triggers when runtime exceeds interval) or Nominated Day (triggers on soonest specified time/day after runtime exceeds interval).

TODO

An example would be that the service is deferred until the following Monday at 9am. This means that the system would run for up to a week without being maintained, however this gives a more realistic downtime, immediate could happen on a Sunday at 3am when nobody will be around to maintain the system.